Malta International Contemporary Art Space (MICAS) seeks a qualified contractor to design, install, test, and certify a comprehensive structured cabling system to support its network infrastructure and connectivity requirements.
The successful contractor will be expected to collaborate closely with MICAS’ IT Department and engineering consultants throughout the project lifecycle.
Due to the urgency of this scope of works the contractor will be accorded allowance to work outside normal working hours including Saturdays, Sundays, and public holidays.
Copper Cabling: Cat6 Shielded Twisted Pair (STP) or Foiled Fully Screened Twisted Pair (FFTP) copper cabling will be installed throughout the Administration Block to support high- speed data transmission.
Network Connectivity: Cabling will extend from patch panels in the Main Distribution Frame (MDF) to floor boxes in the raised flooring, providing wired Ethernet connectivity. Additionally, STP/FFTP uplinks will be installed to support wireless access points (APs) for two separate Wi-Fi networks: one integrated with MITA’s MAGNET network and the other with a private WiMAX network.
To provide high availability and fault tolerance, a dual fibre optic backbone network will be
implemented throughout the MICAS complex.
Physical diversity and resilience are ensured through separate underground manhole routing for each fibre backbone. All fibre optic cables must be installed within rodent-proof metal sleeving supplied by the contractor to protect against physical damage.
Note: All network cabinets and racks must adhere to industry standards for weight capacity, ventilation, and cable management.
Purpose: To establish a private, ISP-independent Wi-Fi network utilizing Ubiquiti APs provided by the contracting authority. The network will serve external visitors, staff, and general operational requirements.
Scope: The solution will encompass the design, implementation, configuration, testing, and documentation of a Wi-Fi network reliant on a WiMAX backbone.
General Requirements
BOQ Passive Equipment: Appendix 1 – The MICAS Structured Cabling Solution BOQ must be submitted in its entirety. MICAS already has several passive equipment items in stock. The successful bidder will be expected to supply only those items that MICAS does not currently have in stock. (Items listed in the BOQ will be paid if utilised).
|
The Expression of Interest opens on: |
19 August 2024 |
|
Site Visit – MICAS, Ospizio Complex, Bieb il-Pulverista, Joseph J. Mangion Street, Floriana: |
26 August 2024 at 10:00 am CET/CEST |
|
Clarification requests maybe submitted via email on people@micas.art by not later than: |
30 August 2024 |
|
Applications are to be submitted via email on people@micas.art by not later than: |
6 September 2024 at 16:00 am CET/CEST |
|
Opening of offers: |
9 September 2024 at 16:30 pm CET/CEST |
|
Award Stage: The winning bidder will be notified by the end of the day on: |
13 September 2024 |
Any clarification requests and/or the completed applications need to be submitted via email on people@micas.art indicating the following text in the subject field:
Ref No: MICAS/EOI/11/2024 : Expression of Interest: Structured Cabling and Network Infrastructure Installation
The opening schedule shall be affixed on the notice board of MICAS in the order of how the applications were received. Only the name of the contractors who submitted an offer under this Expression of Interest shall be displayed on the said opening schedule; no prices shall be listed on such schedule.
Please find the EOI Document, Appendix 1 and Appendix 2.
Additional technical specifications are to be found here:
Late and/or incomplete applications will not be considered.
The sole award criterion will be the price. The contract will be awarded to the interested person/company submitting the cheapest priced offer satisfying the General Requirements and Technical Specifications requested in this EOI.
The passive networking infrastructure for MICAS, including the structured cabling system and wireless networking, will provide a robust, reliable, and future-proof foundation to support the art space’s diverse connectivity requirements. This comprehensive solution will enable MICAS to effectively engage with contemporary art and culture, both globally and locally, while ensuring seamless and secure communication throughout the facility.proofread_EOI Document – Structured Cabling and Network Infrastructure Installation
Operational Programme I – European Structural and Investment Funds 2014-2020 “Fostering a competitive and sustainable economy to meet our challenges”. Project may be part-financed by the European Regional Development Fund Co-financing rate: 80% European Union Funds; 20% National Funds.
Operational Programme I – European Structural and Investment Funds 2014-2020 “Fostering a competitive and sustainable economy to meet our challenges”. Project may be part-financed by the European Regional Development Fund Co-financing rate: 80% European Union Funds; 20% National Funds.
© Malta International Contemporary Art Space 2023
© Malta International Contemporary Art Space 2026
© Malta International Contemporary Art Space 2024
Operational Programme I – European Structural and Investment Funds 2014-2020 “Fostering a competitive and sustainable economy to meet our challenges”. Project may be part-financed by the European Regional Development Fund Co-financing rate: 80% European Union Funds; 20% National Funds.
Operational Programme I – European Structural and Investment Funds 2014-2020 “Fostering a competitive and sustainable economy to meet our challenges”. Project may be part-financed by the European Regional Development Fund Co-financing rate: 80% European Union Funds; 20% National Funds.
© Malta International Contemporary Art Space 2023